Support Klamath Trails

Want to make a difference? You can help grow the network of recreational trails in beautiful Klamath County, Oregon. We have three ways you can get involved and support Klamath Trails Alliance. 

Memberships

If this secure online membership form isn’t your thing, please print out a membership form and return it to:

 

The Klamath Trails Alliance
P.O. Box 347
Klamath Falls, Oregon 97601.

Please consider making this a reoccurring membership. Klamath Trails Alliance is an IRS approved 501(c)3 tax-exempt organization.

Join the KTA

The best way to support Klamath Trails Alliance is to become a member! 

 

As an all volunteer organization 100% of  your annual dues pays the everyday costs of running our organization.

We currently have 150  members and would love to have 500 so we can better fulfill our mission of building and  maintaining great trails for YOU! 

 

By Joining, You are Helping Us….
  • Support trail building and maintenance on over 140 miles of local trails.
  • Strengthening our voice with land managers and grantors.
  • Educate the community on the benefits of trails.
  • Join a community of like-minded hikers, bikers, runners and outdoor enthusiasts.

Donate

We are always fundraising to help up expend and improve the local trail systems. Please consider contributing financially to help improve our local trails.

 

If you prefer to donate via check, please send it to:
The Klamath Trails Alliance
P.O. Box 347
Klamath Falls, Oregon 97601

 

TAX DEDUCTIBLE: Klamath Trails Alliance is a tax-exempt, 501(c)(3) non-profit corporation (tax ID number 46- 0879155). All contributions to Klamath Trails Alliance are tax deductible to the extent permitted  by the law

two ways to contribute

The General Fund gives us the most flexibility to use your donation where it is needed most.

The Mountain Fund is restricted to the completion of our master plan at Spence.

Volunteer

If you’re interested in volunteering, check out the calendar below. You’ll also find information on KTA sponsored events, trail maintenance and building events on our MeetUp Calendar.

 

To find out more on how you can participate, contact us at info@klamathtrails.org!

How you can volunteer:
KTA Events Calendar

Calendar is interactive. Click on event for more information.

Log your Hours

With our new work log system, fill out the form below. You’ll receive an email with a link to submit your work hours and information.

Work Log

Check out these past few work parties. To get involved in the next one, head over to the MeetUp calendar or contact us if you are looking for some dirt to move.

Total Records Found: 654, showing 10 per page
NameVolunteersTrail/AreaWork DoneDateHours
Heather Berg Heather Berg FS Brown Mnt and Billie Crk Nature Loop Scouted Brown for 5/30 volunteer project. Continued brushing and raking on Billie Loop. The north leg is completed up to the bridge. May 28, 2026 11
Dwight Johnson Dwight Johnson High Lakes Inspected trail for downed trees...cutout 3 leaners (4"/6"/7"). Also removed numerous sticks and broken off limbs. May 28, 2026 7.5
Heather Berg Heather Berg 4 Guy Chislett 4 Karen Poole 3 FS Billie Creek Nature Loop Sign install, brushing and raking. Got run out by thunderstorm! Needs a full day to finish. May 26, 2026 11
Lee Heckman Luke M, self Rye Spur Built the corner re-route. March 26, 2026 16
Theresa Ross DARYL,CLARE,LINDA,JACKSON,AARON,MISTY,SARAH,TIM,SUZANNE,WES,VIVIAN,GRANT,KEVIN,DENNIS QUEEN OF THE LAKE CLEARED THE BLACK SECTION OF QUEEN OF THE LAKE AND FIRST MILE OF BLUE QUEEN OF THE LAKE May 24, 2026 95
Theresa Ross EVAN,TAI,ESTEE,CLARE,RANDY,DARYL,BAILEY,MICHEAL,ANDY,MELISSA,KEN,TY,BRANDON,SHERIL,KEVIN,TRENT,GRANT,JONATHON,DENNIS,TIM,ALLISON,ARIGN,JODY,KELLY,RACHEL,REBEKAH,BEU,MISTY,AARON,JEREMY, SHOAL WATER BRUSHED AND CLEARED OLD EAGLE AND BOTTOM OF NORTH SHOAL WATER, RAKED AND CLEARED SIGHT LINES ON CHIQUAUPIN AND UPPER WINEMA, FIXED GRAVEL FOR ADA ENTRANCE TO PIT TOILET AREAS, FIXED GATE ON BOTTOM OF MAZAMA May 23, 2026 225
Grant W self Brown Mtn Clean up work from the BMT 'summit' to Rd 3705. Cut log ends to widen, raked up debris, light brushing. May 22, 2026 7
Heather Berg Heather Berg FS Sevenmile Marsh and Ranger Springs Seven Mile -Recon, flicking sticks and minor saw prep. 30-40 trees down. A couple really messy clusters. Passable for hikers. Difficult for stock. FS/Air Force will log out. Ranger Springs - Recon, flisking sticks and cut prep. 10 or so trees down. 2 biggies. PCTA planning trip in July. May 22, 2026 8
Heather Berg Heather Berg Ray Holliday FS Cold Springs and Sky Lakes Tr Worked with FS Ian to continue log out and drainage mntc on Cold Springs Tr to Sky Lakes jct and Sky Lakes Tr to Deer Lake. Still a handful of trees between Deer Lake and PCT. May 21, 2026 19
Heather Berg Heather Berg Guy Chislett Karen Poole Mark Whyte FS High-Rye Connector Phase 2 dig day. Brushed, then dug 600 feet of tread and installed 3 signs. Needs some additional tread work in middle but it's ready to use. Also cut out a tree on High Lakes. 8.5 hours x 4 volunteers = 34 May 20, 2026 34